New Yorker PVCG Series Installation, Operating And Service Instructions

Download or browse on-line these Installation, Operating And Service Instructions for New Yorker PVCG SERIES Boiler.

New Yorker PVCG SERIES Manual Information:

This manual for New Yorker PVCG SERIES, given in the PDF format, is available for free online viewing and download without logging on. The guide contains 40 pages, and the size of the file at download is . The document type is Installation, Operating And Service Instructions.

Download Manual

More Manuals:

In case you failed to obtain relevant information in this document, please, look through related operating manuals and user instructions for New Yorker PVCG SERIES. Just click one of the links below to go to the selected manual:

Summary of Contents:

[Page 1] New Yorker PVCG SERIES

INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS PVCG rM SERIES GAS BOILER BEFORE INSTALLATION: READ THIS MANUAL SAVE THESE INSTRUCTIONS Installing contractor and homeowner should read and be informed as to the proper installation and operation of th...

[Page 2] New Yorker PVCG SERIES

IMPORTANT INFORMATION - READ CAREFULLY NOTE: The equipment shall be installed in accordance with those installation regulations enforced in the area where the installation is to be made. These regulations shall be carefully followed in all cases. Aut...

[Page 3] New Yorker PVCG SERIES

This boiler requires regular maintenance and service to operate safely. Follow the instructions contained in this manual. Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life...

[Page 4] New Yorker PVCG SERIES

Table of Contents I. Pre-Installation .................................. 5 II. Unpack Boiler ................................... 7 III. Venting ............................................. 8 IV. Water Piping and Trim .................... 14 V. Gas P...

[Page 5] New Yorker PVCG SERIES

I. Pre-lnstallation Do not install boiler where gasoline or other I flammable vapors or liquids, or sources of I hydrocarbons (i.e. bleaches, cleaners, chemicals, I sprays, paint removers, fabric softeners, etc.) are I used or stored. I Due to the lo...

[Page 6] New Yorker PVCG SERIES

Bo Co Do Eo E Go H. Io ilmnediately against carrier by consignee. No claims for variances or shortages will be allowed by Boiler Manufacturer, unless presented within sixty (60) days after receipt of equipment. Installation must conform to the requir...

[Page 7] New Yorker PVCG SERIES

7. Alternate method for boiler located within col_[ined space. Use indoor air if two permanent openings communicate directly with additional space(s) of sufficient volume such that combined volume of all spaces meet criteria for unconfined space. Siz...

[Page 8] New Yorker PVCG SERIES

III. Venting Do not use this boiler with galvanized, Type 304 or Type 316 stainless steel, non metallic or any other non AL29-4C ® based vent systems. Do not use a barometric damper or drafthood with this boiler. Do not use vent dampers with this bo...

[Page 9] New Yorker PVCG SERIES

Table2:VentSystemComponents Vent System Component Current Gasket-less Vent Part Number New Gasketed Vent Part Number 3" Dia. Pipe x 1 Ft 61160112 8116296U 3" Dia. Pipe x 3 Ft 61160101 8116298U 3" Dia. Pipe x 5 Ft 61160111 8116300U 3&qu...

[Page 10] New Yorker PVCG SERIES

Co 6. 7. After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas burning appliance to the...

[Page 11] New Yorker PVCG SERIES

bondRTV4500(Acetoxy)andSil-bondRTV6500. Donotuseotheradhesivesorsealants. E. Install Vent Pipe, Gasket-Less Vent System. 1. Procedure for Joining Gasket-Less Vent Pipe and Fittings. See Figure 4A. /ii Figure 4A: Gasket-Less Vent Joint Detail a. Clean...

[Page 12] New Yorker PVCG SERIES

f. Once the installation is complete, operate appliance and inspect all joints to ensure that flue gases and/or liquid condensate will not escape. 2. Procedure for joining the female end of Gasket- Less Vent with the male end of Gasketed Vent. See Fi...

[Page 13] New Yorker PVCG SERIES

Figure 5: Recommendations for Thimble and Wall Penetration ...

[Page 14] New Yorker PVCG SERIES

IV. Water Piping and Trim Failure to properly pipe boiler may result in improper operation and damage to boiler or structure. Oxygen contamination of boiler water will cause corrosion of iron and steel boiler components, and can lead to boiler failur...

[Page 15] New Yorker PVCG SERIES

1¼ sUPPLY VALVE SYSTEM sUPPLY AIR ScoOP ® TO ZONE I FLOW cONTROL - "VALVE CIRCULATOR sUPPLY Figure 7: Recommended Water Piping for Circulator Zoned Heating Systems ...

[Page 16] New Yorker PVCG SERIES

Ob VAL\_ _R VE_ FRON #DDmO_ ZONE i _i_ _ FROMzo.E2 _'°_w_ _ FROM_JAN_EwA_R HEATER OR ZONE I SH_-OFF 1¼ VALV_ TO _CE TO WATER HEA__R ZONE 1 Z_E 2 OF_) _M RETURN P{PE _TH_N 6" OF FI,_OOR S_EM SUPPLY Figure 8: Recommended Water Piping for Zo...

[Page 17] New Yorker PVCG SERIES

H. If boiler is connected to heating coils located in air handling units where they may be exposed to refrigerated air, boiler piping must be equipped with flow control valves to prevent gravity circulation of boiler water during operation of cooling...

[Page 18] New Yorker PVCG SERIES

V. Gas Piping Failure to properly pipe gas supply to boiler may result in improper operation and damage to the boiler or structure. Always assure gas piping is absolutely leak free and of the proper size and type for the connected load. An additional...

[Page 19] New Yorker PVCG SERIES

Co Pressure test. The boiler and its gas connection must be leak tested before placing boiler in operation. Protect boiler gas control valve. For all testing over */2psig, boiler and its individual shutoff valve must be disconnected from gas supply p...

[Page 20] New Yorker PVCG SERIES

PVCG boilers built for installation at altitudes greater than 2,000 feet above sea level have been specially orificed to reduce gas input rate. See rating label for gas orifice size. High identifiable by the second digit in the model number suffix on...

[Page 21] New Yorker PVCG SERIES

C LSI48E COMBNATON CONTROL E_,{S SUPPUED BY !NSTAL_R BK r SLOWER (SLOWER RELAY} SCHEM$_IC DIAGRAM _GEND SLOWER ..... bOW VOLTAGE SIZE 18 AWG _PE TEWiAW_'_ISTRANDED W_R[ - I05"C ..... LOW VOLTAGE SIZE 18/2 AWG POWER UMFED C_RCUIT CAB_ - 75-1...

[Page 22] New Yorker PVCG SERIES

VII. System Start-Up Ao Uo Co Do Safe operation and other performance criteria were met with gas manifold and control assembly provided on boiler when boiler underwent tests specified in America17 NatiolTal StalTdardfor Gas-Fired Lou,- Pressure Steam...

[Page 23] New Yorker PVCG SERIES

FOR YOUR SAFETY READ BEFORE OPERATING WARNING: If you do not follow these instructions exactly, a fire or explosion may r causing property damage, personal injury, or loss of life. A. This appliance is equipped with an ignition device which automatic...

[Page 24] New Yorker PVCG SERIES

H. Operating Instructions 1. 2. See Figure 13 to place boiler in operation. Electronic Ignition Modules with LED indicators. Table 7 cross-references the ignition module terlninal designations to the ignition terminal numbers in the wiring ladder dia...

[Page 25] New Yorker PVCG SERIES

Table 9: Green LED Status Codes Green LED Flash Code Indicates Next System Action Recommended Service Action (X + y)a OFF No "Call for Heat" N/A None Flash Fast Startup - Flame sense N/A None calibration Heartbeat Normal operation N/A None ...

[Page 26] New Yorker PVCG SERIES

Honeywell Electronic Ignition Troubleshooting Guide [ P_ GASS_Y OFF_ "PJR_?HER_'_TAT (_O_3TO "_ FOR HFJ_T,_ NOTE:_t FORHEAr 24 VACSUP_Y IS _ TO _ 24V _Mr_ _ _E _ 26 \ YES "CALLFORHEAT* _ i Y£S Figure 15: Troubleshooting Guide ...

[Page 27] New Yorker PVCG SERIES

Io Jo Sequence of Operation. See Figure 16. If boiler fails to operate properly, see Troubleshooting Guides in Service Section. Check pilot burner flame. See Figure 17. Flame should be steady, medium hard blue enveloping 3/8 to 1/2 inch of sensing pr...

[Page 28] New Yorker PVCG SERIES

O. P. 3. Main burners and pilot burner will extinguish and blower stop when water level drops below low water cut-offprobe. Verify limit, thermostat or other controls have not shut off boiler. 4. Adjust thermostat to lowest setting. Refill boiler. Ch...

[Page 29] New Yorker PVCG SERIES

VIII, Service This boiler uses flammable gas, high voltage electricity, moving parts, and very hot water under high pressure. Assure that all gas and electric power supplies are off and that the water temperature is cool before attempting any disasse...

[Page 30] New Yorker PVCG SERIES

Eo 2. Terminal and wall thimble (if used) must be weathertight. 3. Pipe must be full round shape, and show no damage from impact or excessive temperature. 4. Pipe must be supported at lninilnuln five (5) foot intervals and must not sag. 5. All vent j...

[Page 31] New Yorker PVCG SERIES

b. Sparkgapshouldbe1/8inchforoptimum performance. 3. Toreplacecompletepilotassembly. a. Removetwomachinescrewsholdingpilot burnertopilotbracket. b. Disconnectpilotrobing. c. Disconnectallotherleadstopilot. d. Selectpilotassemblywithidenticalmodel num...

[Page 32] New Yorker PVCG SERIES

Io Jo Lubrication. There are no parts requiring lubrication by service technician or owner. Circulator bearings are water lubricated. Blower motor bearings are factory sealed. Procedure for measuring fan inlet pressure. See Figure 21. PF!ESSURE SWTO ...

[Page 33] New Yorker PVCG SERIES

THIS PAGE LEFT INTENTIONALLY BLANK 33 ...

[Page 34] New Yorker PVCG SERIES

START HERE TURN THERMOSTAT (CON_OLLER) TO CALL FOR HEA_ I CIRCULATOR NO DOES CIRCULATOR ENERGIZE? YES AT TERMINAL 'NC' ON DOES BLOWER ENERGIZE? PRESSURE SWITCH YES !YES IYEs I CHECK FOR 24- VOLTS I BOTH SIDES OF BLOWER | RELAYCO!L ] I YES :...

[Page 35] New Yorker PVCG SERIES

I CHECK FOR 24 VOLTS t .................................................. AT THERMOSTAT TERMINAL "PC' ON L814,8E COMBiNATiON CONTROL I.° YES NO | REPLACE_14-8E I | COMBINATION CONTROL I DETERMINE CAUSE OF | POWER FAILURE AND I CORRECT CAUf...

[Page 36] New Yorker PVCG SERIES

IX. Repair Parts All PVCG TM Series Repair Parts may be ordered through New Yorker Boiler Co., Inc., or its authorized distributors. Should you require assistance in locating a New Yorker distributor in your area, or have questions regarding the avai...

[Page 37] New Yorker PVCG SERIES

Description Pilot Assembly, Natural Gas, Honeywell Q348A1002 Pilot Assembly, LP Gas, Honeywell Q348A1010 Pilot Tubing, 1/4" OD x 40" Gas Valve, 1/2 x 1/2, Natural Gas, Honeywell VR8204C3007 Gas Valve, 1/2 x 1/2, LP/Propane, Honeywell VR8204...

[Page 38] New Yorker PVCG SERIES

X. Low Water Cut Off (LWCO) on Hot Water Boilers When A low water cutoff is required to protect a hot water boiler when any connected heat distributor (radiation) is installed below the top of the hot water boiler (i.e. baseboard on the same floor le...

[Page 39] New Yorker PVCG SERIES

DATE SERVICE RECORD SERVICE PERFORMED 39 ...

[Page 40] New Yorker PVCG SERIES

NEW YORKER BOILER CO., INC. " imite tarranties For Residential Cast Iron and Steel Water Boilers By this Warranty Statement New Yorker Boiler Co., Inc. ("New Yorker"), issues limited warranties subject to the terms and conditions st...